Our Successful Projects
Feb. 2023 – Present Arch Builders and Construction, LLC.
(Kawneer/OldCastle/S&J Sheetmetal Products) NY
Installation of aluminum panels, aluminum portal trim, aluminum canopies, storefront doors, and final punchlist.
March 2022 – Present Bolivar Developers (Intus Product) NY
270 East 203rd St. Installation of 395
Heavy Duty Acoustical Vinyl windows.
May 2023 – Aug. 2023 Eliglass, Inc. (Kawneer/Old Castle Products)NJ
Edison Nissan Replacement of 120 IGUs 10 glass doors and modifications of curtainwall sections.
July 2021 – Aug. 2022 Bolivar Developers (Kawneer/Old Castle Products) NY
980 Westchester Ave Installation of 7,000 SF of curtainwall, all “F” & “T” clip installations. Also, panels, doors, spandrel glass, breakmetal, soffits, column covers, and louvers, all with installation components and caulking.
March 2021 – Aug 2022 Bolivar Developers (S&J Sheetmetal Product) NY
980 Westchester Ave Installation of 498
Aluminum Sills (.063).
Nov. 2021 Bolivar Developers (S&J Sheetmetal Product) NY
1325 Jerome Ave Installation of Canopy
substrate and .063 Aluminum Panels.
June 2021- Nov. 2021 Bolivar Developers (Misc.) NY
1325 Jerome Ave Miscellaneous Works and Punch List.
Nov. 2020 – June 2021 Bolivar Developers (Intus Product) NY
980 Westchester Ave Installation of 498
Heavy-duty acoustic vinyl windows.
Nov. 2020 – Nov. 2021 Bolivar Developers (Reynaers Product) NY
1325 Jerome Ave Installation of 4,600 SF of curtainwall and punch window, all “F” & “T” clip installations. Also, panels, doors, spandrel glass, breakmetal, soffits, column covers, and louvers, all with installation components and caulking.
Sept. 2018 – May 2020 KJP Enterprises (Kawneer Product) NY
Greenpoint Blue Slip Installation of 153,000 SF x (4 Stories) of curtainwall and storefront all “F” & “T” clip installations. Also, panels, doors, slab covers, breakmetal curbs, and oversized louvers, all with installation components and caulking.
July 2019 – Aug. 2019 KJP Enterprises (Nickel) NY
20 West 40th St Installation of Ornamental Grills on the facade of 6,400SF 30FT high roof cap.
July 2016 – Feb - 2017 Nagan Construction (Architectural Window Product) NY
South Bronx Job Corp Replacement and/or installation of 90 aluminum casement windows with interior & exterior breakmetal, installation of 10 circular and arch top windows, corrections of multiple previously installed windows approx 350.
Feb. 2016 – July 2016 Nagan Construction (Westchester Tempering Product) NY
Floyd Bennett Field Hangar B Replacement and/or installation of 1,300 steel tempered glass window panes with butyl glazing tape and interior caulking.
July 2016 – July 2016 KJP Enterprises (Kawneer Product) NY
44th Road Installation of 12 storefront frames and door openings w/transoms 1/4” tempered glass glazing, caulking.
May 2016 – July 2016 Nagan Construction (St Cloud Window Product) NY
Floyd Bennett Field Hangar B
Replacement and installation of 180 Awning-Style windows with interior blocking/breakmetal int/ext caulking.
July 2015 – July 2016 Nagan Construction (Sherwin-Williams Epoxy Paint) NY
Floyd Bennett Field Hangar B
Sanding/Painting of Hangar Doors, Clerestory Steel frames, and Skylight Monitor Steel frames, total paint area equaled 500,000 Sq Ft. 3 Part Marine Epoxy;^ 1 – pre-prime ^2 – prime ^3 – final coat.
June 2016 – June 2016 KJP Enterprises (Architectural Metal Fabricators) NJ Florham, NJ Installation of 27 1/2” office glass partition panels and 2 Herculite doors.
May 2015 – May 2015 Generation 3 Glass & Metal (Westchester Tempering Product) NY
Prudential Insurance Office Installation of 40 1/2” office glass partition panels and 2 Herculite doors
Dec. 2014 – June 2015 KJP Enterprises (EFCO Curtainwall Systems) NY
The Master's School Installation of six 16’ X 25’ Curtainwall systems int/ext caulking.
Nov. 2014 – Dec. 2014 Karey Kassl Corp (Karey Kassl Product) NY
Giscombe Realty Replacement and installation of approximately 50 double-hung windows with wrap-around panning, box trim, insulation, and int/ext caulking.
Oct. 2014 – Oct 2014 Karey Kassl Corp (Karey Kassl Product) NY
St John’s Prep HS: Replacement and installation of 15 double-hung 3 Banger window systems int/ext caulking, removal of steel window gates.
Sept. 2014 – Apr. 2015 Karey Kassl Corp (Karey Kassl Product) NY
Fairfield Properties Replacement and installation of 150 double-hung windows with wrap-around panning, wood casing/molding, int/ext caulking.
Aug. 2014 – Aug. 2105 Karey Kassl Corp (Karey Kassl Product) NY
Mount St Michael HS: Replacement and installation of 80 double-hung windows with wrap-around panning, int/ext caulking